Most of us have long time experience in working with intelligent pipeline tools

Enquiry

ELECTRONIC GEOMETRIC PIGGING

EGP is intended for measurement of internal pipeline bore profile and determination of pipeline axis position. Operation principle of electronic geometry pig is based on reconstruction of pipe internal cross section according to the data of lever measuring system.

With EGP technology from Analytic Pipe, we are quite capable of executing a Caliper/ EGP Job so as to identify any out of roundness or the geometrical defects of pipelines of sizes from 8in - 48in. We are fully equipped to handle a caliper inspection job of any cross-country pipeline transporting oil & gas including those at the construction stage i.e., during the pre-commissioning activities.

Principle Of Operation

Caliper pig or the Electronic Geometry Pig is a device which is designed to measure the internal geometry of the pipeline including dents, buckles & ovalities. Also, it is capable of identifying the other pipeline features like girth welds, change in wall thickness, bends, tees and valves etc.

During a caliper tool inspection, the pig travels inside the pipeline and continuously measures the inside diameter through an array of sensing fingers mounted circumferentially on it. Our Caliper-Tools are capable of negotiating a bore restriction of ~ 25% of Pipeline ID. During the calliper tool inspection, the data is digitised and recorded on a solid state memory inside the recorder.

video

The very first EGP job was executed by us in year 2005 for GAIL (India) Ltd. for a small pipeline section of Dia. 12" ~50 Km in southern part of India. Since then, we have successfully carried out EGP surveys for several new pipeline projects under the ownership of GAIL, IOCL, HPCL, BPCL, GSPL, GIGL and their PMCs like EIL, MECON, GSPL, GIGL, JP Kenny/ Wood Group, Tractebel etc. So far we have completed more than 8000 Km of EGP inspection jobs in India for various sizes of oil & gas pipelines.
We are fully equipped to handle the EGP jobs of Dia. 8" - 30" pipelines in India and can also undertake jobs for the larger sizes upto 48in with co-operation from our counterpart abroad.

Our “Reference List” for the major EGP jobs executed in India

S.No Pipelines Details Agencies Involved Year of Completion
Owner Consultant Contractor
1 Dia. 18” & 16” HDD Sections at PHPL Project of M/s IOCL IOCL IOCL NANDINI IMPEX PVT. LTD. 2021(In Progress)
2 Dia. 30”, HDD Section at Barauni Crude Oil Pipeline Project of M/s IOCL IOCL IOCL ACE PIPELINE CONTRACTS PVT. LTD. 2021
3 Dia. 24” HDD Sections at BGPL Project of M/s GAIL IOCL IOCL PLN CONSTRUCTION LTD. 2021(In Progress)
4 Dia. 18” HDD Sections at PSHPL Project of M/s IOCL IOCL MECON NANDINI IMPEX PVT. LTD. 2021(In Progress)
5 Dia. 30” x 117 Km, Barauni Crude Oil Pipeline Project of M/s IOCL IOCL IOCL ACE PIPELINE CONTRACTS PVT. LTD. 2021(In Progress)
6 Dia. 30” x 150 Km, DDPL-A Project of M/s GAIL (India) Ltd. GAIL EIL CORRTECH INTERNATIONAL PVT. LTD. 2021
7 Dia. 24” HDD at KKBMPL Project of M/s GAIL (India) Ltd. GAIL MECON KALPATARU POWER TRANSMISSION PVT. LTD. 2020
8 Dia. 24” x 32 Km, KKBMPL Project (Phase-II), Section-IVB GAIL MECON IL&FS ENGINEERING & CONSTRUCTION CO. LTD 2020
9 Dia. 16”/ 14” HDD Sections at IOCL-PHPL Pipeline Project IOCL IOCL GYPSUM STRUCTURAL INDIA PVT. LTD. 2020
10 Dia. 24” x 74 Km, KKBMPL Project (Phase-II), Section-IVA GAIL MECON NIL&FS ENGINEERING & CONSTRUCTION CO. LTD. 2020
11 Dia. 16” x 11 Km, Suveli Project of M/s GAIL IOCL BUCON ENGINEERS & INFRASTRUCTURE PVT. LTD. 2019 (Yet to start)
12 Dia. 10” x 18 Km, CBM2 Project of M/s RIL RIL RIL L&T HYDROCARBON ENGINEERING LTD. 2019
13 Dia. 24” x ~1 Km, HDD of KKMBPL Project M/s GAIL GAIL MECON MANISH J INFRA PROJECTS PVT. LTD. 2019
14 Dia. 16” x 370 Km & 14” x 222 Km, PHPL Project (Group-B) of M/s IOCL IOCL IOCL L&T HYDROCARBON ENGINEERING LTD. 2019(In Progress)
15 Dia. 12”/ 10” HDD Sections at PHDPL Project of M/s IOCL IOCL IOCL PLN CONSTRUCTION LTD 2020